Duration:
Feasability study about under-water inspection of hydroelectric power plants

Feasability study about under-water inspection of hydroelectric power plants

Images

The subject of this project is the creation of a feasibility study about the deployment underwater robots for the inspection of hydraulic turbines. To assess their feasibility a visual inspection of the hydroelectric power plant "São Salvador", which is one of Tractebel Energia's power plants will be conducted with a remotely operated underwater vehicle (LBV 150²). This data will serve as the basis for the feasibility study.

Sponsors

Tractebel Energia